No trains from Fleet, Winchfield or Hook on 25 or 26 December. SWR's last train from Waterloo on Christmas Eve leaves about 10pm. Full plan to 4 January.
There will be no trains at all from Fleet, Winchfield or Hook on Christmas Day, Friday 25 December 2026, or on Saturday 26 December. South Western Railway has now published its whole plan for the holiday on National Rail’s bank holiday page. On Christmas Eve, the last train leaves London Waterloo at around 10pm. National Rail’s Christmas and New Year travel summary covers Thursday 24 December to Monday 4 January.
Overview
- Thursday 24 December: early finish. SWR’s last train leaves London Waterloo at around 10pm.
- Friday 25 and Saturday 26 December: no SWR trains.
- Sunday 27 December: a late start and a reduced service, with the first train from Waterloo at 06:14.
- Monday 28 to Wednesday 30 December: a Saturday level of service. Monday 28 is the substitute Boxing Day bank holiday.
- Thursday 31 December: last train from Waterloo before midnight, then extra trains from Waterloo between 01:00 and 04:45 on New Year’s Day.
- Monday 4 January: normal service, apart from late-night work around Eastleigh.
Updated 5 November: SWR has filled in Christmas Eve, 26 December, New Year’s Eve and 2 to 4 January. The 27 December to 1 January plan is as it was, with the 06:14 first train from Waterloo on the 27th now added. National Rail’s guides to the last trains are still to come.
SWR’s plan, day by day
| Date | SWR’s plan as at 5 November 2026 |
|---|---|
| Thursday 24 December | Services finish early; last train from London Waterloo around 22:00 |
| Friday 25 December | No trains |
| Saturday 26 December | No SWR trains |
| Sunday 27 December | Later start, first train from Waterloo at 06:14. Reduced and amended service to and from Waterloo because of engineering work |
| Monday 28 December | Saturday level of service, with engineering changes. Twickenham-area services busier for rugby |
| Tuesday 29 and Wednesday 30 December | Saturday level of service |
| Thursday 31 December | Services finish early; last train from Waterloo before midnight. Queuing at Waterloo for the London fireworks |
| Friday 1 January 2027 | Extra trains from Waterloo 01:00 to 04:45, resuming at 06:20. Sunday level of service, subject to engineering work |
| Saturday 2 and Sunday 3 January | Buses replace trains on parts of the route west and south of Basingstoke |
| Monday 4 January | Normal service, with late-night changes around Eastleigh |
The engineering changes SWR lists for 27 and 28 December are mostly on the suburban routes: Salisbury trains run only between Basingstoke and Salisbury, Portsmouth and Poole trains via Eastleigh run only from Basingstoke, Dorking trains do not run, and Queenstown Road station is shut (Earlsfield too on the 28th). Weymouth trains make extra stops, at Farnborough on the 27th and at Clapham Junction, Woking and Basingstoke on the 28th. The notice does not list any change to the Waterloo to Basingstoke stopping trains that serve Fleet, Winchfield and Hook, and it does not name those stations, so check your own journey in a planner.
The New Year’s Day notice says only that the extra overnight trains run from Waterloo; it does not say which of them stop at Fleet, Winchfield or Hook. National Rail says its guide to those services is due in early December.
On 2 and 3 January, buses run between Andover and Gillingham (Dorset) and between Salisbury and Gillingham, and between Winchester and Southampton Central on the 2nd. On the 3rd they also run from Basingstoke to Southampton Central and from Basingstoke to Fareham. That matters if you are heading beyond Basingstoke; the notice lists nothing east of it on those days.
What National Rail still has to publish
| Date | What we know |
|---|---|
| Thursday 24 December | National Rail’s guide to the last trains from London is still to be published |
| Saturday 26 December | Most operators run no service; a very limited service from a few, details to be confirmed. SWR is not one of them |
| Friday 1 January 2027 | Special services on a number of London routes after midnight; guide due in early December |
National Rail also warns of major engineering work elsewhere that could affect a longer journey, including Birmingham New Street from 24 to 28 December and the line into London Paddington from 27 December to 3 January. That second one matters if you were planning to change at Basingstoke or Reading for Paddington.
What happened last Christmas
For comparison, SWR set out last year’s plan on 15 December 2025, less than a fortnight before Christmas:
- Christmas Eve: an amended timetable, with services “finishing earlier than usual, at around 2200”.
- Christmas Day and Boxing Day: no SWR services.
- Saturday 27 and Sunday 28 December: no services between London Waterloo and Clapham Junction because of engineering work. Trains via Wimbledon, which is the route from Fleet, Winchfield and Hook, started and finished at Clapham Junction. SWR suggested connecting to the District line at Wimbledon, or changing to GWR at Basingstoke for Reading and London Paddington.
- Monday 29 and Tuesday 30 December: a reduced service on lines via Wimbledon, with Vauxhall and Queenstown Road (Battersea) closed.
- New Year’s Eve: an amended timetable, with extra services from London Waterloo to Basingstoke, Guildford and Twickenham between about 1am and 5am for people coming home from the celebrations.
- 1 to 4 January: a reduced service on New Year’s Day, and separate engineering work affecting services towards Woking and Reading on Sunday 4 January.
- Monday 5 January 2026: the normal timetable resumed.
That was the 2025 pattern. This year’s plan is the table at the top of the page.
Parking and shopping in Fleet
Hart District Council has not announced any Christmas parking offer for 2026. Last year it made all its car parks free from 8am to midnight on Small Business Saturday, 6 December 2025, saying the campaign “takes place on the first Saturday in December each year”. Gurkha Square was the exception during the day, because it hosts Fleet Market every Saturday and is closed until the market clears in the late afternoon. (Hart District Council, 3 December 2025) If the offer is repeated, the first Saturday of December 2026 is the 5th.
Car park charges are on parking in Fleet.
Still to be confirmed
- Exact last trains from London on Christmas Eve and the New Year’s Eve late services, in National Rail’s guides due late November or early December. We will check again on 1 December.
- Any Hart Christmas parking offer, which last year was announced on 3 December.
Everyday times and fares are on Fleet to London trains, and road closures on roadworks and travel. Bins move over the holiday too: see Christmas bin collections. School dates for the Christmas break are on Fleet school term dates.
Have your say